TELEHOUSE BEIJING BDA
TELEHOUSE BEIJING BDA* is a large data center located in Beijing Economic Technological Development Area (BDA) in the south east of Beijing., just 30 minutes from Central Beijing.
TELEHOUSE BEIJING BDA provides a colocation facility built and operated to the highest international specifications, offering carrier neutral choice in connectivity. This newly operating state-of-the-art data center enjoys high levels of security, power, cooling and technical support with 99.9999%** availability on equipment. Along with a portfolio of valuable business continuity solutions, TELEHOUSE can build and support a reliable ICT infrastructure for multinational and local corporations within China.
*TELEHOUSE BEIJING BDA is actually operated by Chinese local IDC, ISP operator, strictly based on TELEHOUSE Global standards.
**SLA for power supplied per month with a contract "Diverse (2N)" as type of power supply.


- Features:
- High reliability with high qualified SLA 99.9999%*.
* SLA for power supplied per month with a contract "Diverse (2N)" as type of power supply. - High-level security of Data-Center dedicated building with more space and power meeting customers' demands
- The most advanced technology is employed in TELEHOUSE BEIJING BEZ such as a first of its kind hybrid cooling system installed in China*.
- Carrier neutral and ISP neutral,installing multi-ISP POPs and enjoy ISP diversity
- High level of security designed for purpose built datacenter.
- Provide colocation space and office dedicated spaces in office tower for customers with BCP and DR demands
- Office building is located adjacent to data center providing office space for BCP and DR needs in addition to colocation services.
*Based on our research.
- High reliability with high qualified SLA 99.9999%*.
- Power Facilities:
Redundant power supply routes, solid UPS equipment, redundant generators and also distinctive designs such as below:
- Generators with long-time running capability
- Multiple fuel storage with 36 hours worth of fuel
- External power supply bypass to cover UPS trouble
- Monitoring Battery Status for assuring UPS to work
- Consider various case of emergency and make best effort to overcome it with our cutting-edge technologies
-
Air Conditioning Facility:
Adopted eco-friendly air conditioning system achieving high-efficiency and stability. BDA has Hybrid Cooling System, with chiller and Free Cooling Working together (Using Cold Outdoor Air).
- 2 Loop Lines—Dual For cool/hot water system
- Cold water tanks for air-conditioning in case of emergency
- Optimized air-conditioning according to the status of cabinet
- Heat insulation plate around the building
- Disaster Prevention / Security:
In order to protect the customer's equipment and data, we adopted the following equipment.
- VESDA Sensor + IG541 Gas extinguishing + auto-open cold isle cap
- RFID card door lock control with vein authentication and gate to prevent unauthorized access
- Equipment control with RFID tag
- Anti-intrusion sensor on the walls of DC site with CCTV
Extreme disaster prevention and security system for information security.
- Location
BDA is state level development area certified by the State Council in 1994 where more than 70 companies in Fortune 500 expand into.
There is a large industry and commercial area ,creating 20% of Beijing's GDP and is located in a convenient area just 30 minutes from Central Beijing. - Officially Certified by Uptime Institute as Tier 3 Data Center:
There are only 5 data center in China with uptime institute certificate – TELEHOUSE BEIJING BDA is one of them.
Uptime Institute

Specifications
Building | Location | South east Beijing |
---|---|---|
Provided Area | 25,000m² *including future expansion | |
Ceiling Height | 7.6m | |
Raised Floor Height | 1,000mm | |
Maximum Floor Load | 800-1,500kg/㎡ *depending on area | |
Fire Extinguisher | IG541 gas extinguishing system VESDA sensor | |
Power Supply | Bldg Power Receiving | Utility x 2 loop power distributions |
Emergency Generator | Dual feeds of power supply from 2 different substation with 2 routes | |
UPS | 2N/N+1 (Dual/Single/Multi) | |
Power / Rack | 2-4kVA (Over 4kVA needs consulting in advance) | |
Climate Control | CRAC Config | CRAC N+20% Cooling system N+ 1 |
Temp & Humidity | Temp : 18℃ - 27℃ Humidity : 25% - 60% | |
Leak Sensor | in place | |
Feeder type | Dual Feed (PDU A+A) | PDU: A+A, UPS: N+1 |
Diverse Feed | PDU: A+B, UPS: 2N | |
Network | Transport Carrier | CT, CU, CM |
ISP | SINNET | |
In-house Cabling | Coax, Copper/UTP. PSTN Optical Fiver-SMF, MMF | |
O&M | Operation Hour | 24/7 manned Language: Chinese and English |
Security | CCTV, IC card, Vein auth.Security Guard | |
Others | Rest Space | Cafeteria |
BCP Solution | Yes | |
Parking Space | in place |
Connectivity
- China Mobile(CM)
- China Telecom(CT)
- China Unicom(CU)
- SINNET